HOA Reserve Study: What California and Nevada Boards Must Do

A board member’s guide to the HOA reserve study: what the physical and financial analysis contain, how often California and Nevada require an inspection and review, and what owners must be shown.

Request a quoteCall (350) 200-6955

The reserve study in plain terms

An HOA reserve study is the association’s long-range budget for the big items it must repair or replace, such as roofs, paving or a pool surface. It lists those components with their condition, remaining life and cost, then tests whether the reserve fund and a funding plan will cover them. CAI’s Reserve Study Standards describe it as a limited evaluation made for budget and cash-flow purposes.

California and Nevada each write their own reserve rules into statute, on different cycles and with different words. This page walks through both, California’s Davis-Stirling Act first and Nevada’s NRS chapter 116 in its own section. It is general information for board members, not legal or financial advice: the association’s governing documents, its reserve study provider, its manager and its attorney decide how the rules apply, and both states let governing documents set stricter standards.

Two halves: the physical and the financial analysis

CAI’s standards split every study in two. The physical analysis covers the components: what they are, their condition, expected life and cost. The financial analysis covers the fund’s status and the plan for paying, projecting income and expenses over at least thirty years.

Design review, construction evaluation, destructive testing, preventive maintenance plans and structural or safety evaluations sit outside a reserve study, per CAI. Its 2023 edition was revised after the Champlain Towers South collapse in Surfside, Florida, to bring maintenance and structural integrity into the process, and CAI recommends a preventive maintenance manual and periodic structural inspections alongside the study.

CAI’s test for what counts as a reserve component has three parts:

  1. The association is obligated to maintain or replace it.
  2. The need and timing can be reasonably anticipated.
  3. The total cost is material, can be reasonably estimated and includes all direct and related costs. CAI’s explanation of the standards treats “material” as more than the annual operating budget can readily absorb.

California: the inspection cycle under Civil Code 5550

Short answer: under Civil Code section 5550, as amended effective January 1, 2025, a California board must have the accessible areas of the major components visually inspected at least once every three years, as part of a reserve study, and must review the study every year. The rule applies when the current replacement value of the major components is at least half of the association’s gross budget, leaving out the reserve account.

The inspection must be reasonably competent and diligent. After each annual review, the board considers and makes the adjustments its reserve analysis needs. At a minimum the study identifies:

  • Each major component with less than thirty years of remaining useful life as of the study date.
  • The probable remaining useful life of each one.
  • The estimated cost to repair, replace, restore or maintain it.
  • The estimated total annual contribution needed to meet those costs, after current reserve funds are subtracted.
  • A reserve funding plan.

The funding plan covers each major component with thirty or fewer years of expected life left, except ones the board has decided not to repair or replace. Under the current text, major components include gas, water and electrical lines to the extent Civil Code 4775 makes the association responsible for them.

California: adopting the funding plan and reporting to members

The funding plan is adopted at an open board meeting before the members, under the Open Meeting Act, and must schedule the date and amount of any change in regular or special assessments it needs (Civil Code 5560). An assessment increase to fund the plan takes its own board action within the Civil Code 5605 limits, which the HOA special assessments guide explains.

Members see the reserve picture every year in several documents:

DocumentCode sectionReserve items it carries
Annual budget report, sent 30 to 90 days before the fiscal year endsCivil Code 5300A summary of reserves and of the funding plan (full plan on request), any deferred repairs with the reason, any expected special assessments with amount, start and length, the funding mechanisms, and how reserves are calculated
Summary of reserves, in boldfaceCivil Code 5565Each component’s replacement cost, remaining and useful life; cash needed and cash set aside at year end; construction defect recoveries and how they were spent; percent of needed reserves on hand; the deficiency per unit
Assessment and Reserve Funding Disclosure SummaryCivil Code 5570Regular and scheduled assessments, whether projected balances meet the next thirty years of obligations, the reserve needed and projected at year end, percent funded for this year and the next five, with and without the plan, and the interest and inflation rates assumed
Full report or summaryCivil Code 5320A summary must say on its first page how to get the full report at no cost; members who asked for full reports receive them

One limit matters here: the reserve calculation on the section 5570 form may not assume a return on cash more than 2 percent above the Federal Reserve Bank of San Francisco’s discount rate. Components with more than thirty years of life left may be listed as capital assets or left out, as long as the study and the form say so.

Nevada: a full study every five years

Short answer: under NRS 116.31152 (NRS chapter 116, revised September 2026), a Nevada executive board must have a reserve study conducted at least once every five years, review its results at least once a year to judge whether reserves are sufficient, and make any funding plan adjustments it considers necessary each year.

The study must be prepared by a reserve study specialist registered with the Nevada Real Estate Division; NRS 116.31152 calls this a permit issued under chapter 116A. In a community of 20 or fewer units in a county with fewer than 55,000 residents, the board may use anyone it considers qualified. Someone who helps a registered specialist with a study the specialist signs does not need to register, and neither do board members and officers acting within their duties.

Nevada’s regulation (NAC chapter 116, revised June 2026) sets the clock. The five-year period runs from the on-site inspection of the major components to the board’s adoption of the study at a meeting, and adoption must come within five years of the last full study’s adoption. The next full study starts on or before the same month and day as the previous on-site inspection. Within 45 days after adopting the results, the board submits a summary to the Division on its form, electronically where possible. The Division’s association finances FAQ adds that the board must adopt the study and send that summary no later than 210 days after it receives the first draft.

Nevada: what the study and the reserve budget must show

The statute asks for a summary of the inspection, the major components with under thirty years of life left, each one’s remaining life and estimated cost, and the total yearly assessment needed after current reserves, with a funding plan for adequate reserves. The regulation adds a 30-year schedule of balances, inflation-adjusted contributions, interest and spending; a 30-year comparison of projected ending balances with the fully funded balance; the unit count; a description of each major component; and a remaining-life table.

The study also has to:

  • Describe its funding objectives using the terms full funding, threshold funding and baseline funding where they apply.
  • State its level of service.
  • Carry a prominent statement that its life and reserve estimates assume the association does appropriate routine and preventive maintenance, and that skipping it can shorten component life and sharply raise reserve needs.
  • Disclose the preparer’s qualifications and references, any possible conflict of interest, whether the preparer is bonded or carries professional liability insurance of at least $1,000,000, how components were identified, where the life, cost, interest and inflation figures came from, and any significant component left out of the funding projection.

NAC 116.425 treats reserves as adequately funded when they can keep the common elements at the level in the latest study without operating funds or special or reserve assessments, apart from unforeseen catastrophic events. Under NRS chapter 116, reserves may pay only for repairing, replacing and restoring major components such as roofs, roads and sidewalks, never for daily maintenance, and a funding plan that spreads costs over years must be actuarially sound. The board may impose reasonable assessments based on the study to build adequate reserves without an owner vote, whatever the governing documents say.

Unless the declaration is stricter, the reserve budget goes out 30 to 60 days before the fiscal year, listing each component’s cost and lives, cash needed and set aside, expected special assessments and the preparer’s qualifications. If the projected year-end balance falls short of adequate, the budget says why and how the board will close the gap.

Levels of service: full study or update

Both CAI and Nevada’s regulation sort studies by how much fieldwork they involve. CAI calls an update based on a site inspection at least every third year best practice.

LevelCAI Reserve Study Standards (2023)Nevada, NAC chapter 116
Full studyLevel I: component inventory, condition assessment, life and value estimates, fund status and funding plan, from the provider’s on-site evaluationInventory and quantities, condition from on-site visual observation, life and value estimates, financial analysis, funding plan
Update with a site visitLevel II: the same five tasks; quantities are checked against what is seen rather than re-measured, and new components due inside the 30-year horizon are addedUpdate with a site visit
Update without a site visitLevel III: life and value estimates, fund status and funding planLife and value estimates, financial analysis and funding plan
PreliminaryLevel IV: for a community not yet built, from design documentsNot listed

Percent funded and the three funding goals

Percent funded compares the reserve balance with the fully funded balance. CAI computes the fully funded balance for each component as current cost times effective age divided by useful life, then adds the components together; percent funded is the actual or projected balance divided by that total at a stated date. California’s disclosure form uses a similar years-in-service formula and reports percent funded for the current year and five more, though section 5570 says the board is not required to fund reserves by that formula. CAI reads percent funded alongside its trend and the association’s tolerance for risk, not as a stand-alone measure of adequacy, and neither state’s code sets a required percentage.

CAI ranks three funding goals from most aggressive to most conservative:

  • Baseline funding keeps the reserve cash balance above zero. CAI says it carries the greatest risk, is not recommended as a long-term plan, and can lead to delayed projects, special assessments or a line of credit.
  • Threshold funding keeps the balance above a set dollar amount or percent funded.
  • Full funding aims to reach and hold reserves at or near 100 percent funded.

Providers fund toward the goal with either the component method, straight-line funding for each component added up, or the cash flow method, which pools components and tests plans against projected spending. CAI’s principles are sufficient funds when needed, a stable and equitable rate over the years, and fiscal responsibility.

Who prepares the study

In Nevada the preparer must be registered with the Division unless the small-community exception applies. The Division’s reserve study specialist page lists Form 644, a current photo and fingerprints, and the regulation asks for the ability to judge deterioration, remaining life and cost, to build 30-year projections, and at least 6 hours of Commission-approved education on NRS chapters 116, 116A and 116B, 3 of them on finance.

Boards in either state will also see the Reserve Specialist (RS) designation, which CAI grants after at least 36 months of reserve study work, at least 30 site-based studies in the past three years and a qualifying degree or alternative, renewed every three years. The property management certifications guide covers the letters managers carry, and the HOA vendor selection guide covers hiring outside firms.

Day-to-day upkeep and the reserve fund

Board members often ask how common-area upkeep relates to the reserve study. The statutes and CAI’s standards answer only in general terms. Nevada bars using reserves for daily maintenance. California lets reserve money pay only for repairing, restoring, replacing or maintaining the major components it was set aside for, or litigation about them, and each withdrawal takes two signatures (Civil Code 5510). CAI says a project small enough for the operating budget to absorb is not a reserve component, and its sample component list includes items such as building repaint and hallway refurbishment, as examples only. Nevada’s required study statement ties every life estimate to routine and preventive maintenance being done. Which items sit in your association’s study is for the board and its reserve study provider to settle.

Get help

While the board works through the numbers, Ora Commercial Cleaning keeps the shared spaces owners walk through every day in good order, from lobbies and mailrooms to fitness rooms and clubhouses, through our multifamily and community cleaning service. Ora serves associations across the Bay Area, the Sacramento region, Reno and Carson City with background-checked, insured and bonded crews, and supervisors inspect the work. Tell us about your common areas on the quote request form; we will tour the property before we price anything in writing.

Sources and dates

Read November 10, 2026: California Civil Code sections 5300, 5320, 5500 and 5501, 5510, 5515, 5520, 5550 (as amended effective January 1, 2025), 5560, 5565, 5570 and 5580 on leginfo; NRS chapter 116 (revised September 2026) and chapter 116A (revised April 2026); NAC chapter 116 (revised June 2026) and chapter 116A; the Nevada Real Estate Division’s association finances FAQ (updated August 7, 2026) and reserve study specialist licensing page (updated October 15, 2026); CAI’s Reserve Study Standards (2023 edition), its 2025 explanation of those standards and its Reserve Specialist page. Statutes and regulations change; check the current text before relying on any figure here, as of November 2026.

Common questions

How often must a California HOA update its reserve study?

When the major components’ replacement value is at least half of the gross budget, Civil Code 5550 calls for a visual inspection of their accessible areas at least every three years as part of a reserve study, and a review of the study by the board every year.

How often does a Nevada HOA need a reserve study?

At least once every five years under NRS 116.31152, with the results reviewed and the funding plan adjusted at least once a year. The period runs from the on-site inspection to the board’s adoption of the study.

Who can prepare a reserve study in Nevada?

Someone the Nevada Real Estate Division has registered as a reserve study specialist. The statute lets a community of 20 or fewer units in a county under 55,000 people use anyone the executive board considers qualified.

Does a reserve study check whether a building is structurally safe?

No. CAI’s standards leave structural and safety evaluations, destructive testing and construction evaluation out of a reserve study, and recommend periodic structural inspections as a separate item alongside it.

What does percent funded mean on a California disclosure form?

It is the projected reserve balance divided by the reserves needed, where each component’s need is its current cost times its years in service divided by its useful life. The form shows it for the current year and the next five.

What is the difference between a full reserve study and an update?

A full study inventories and measures every component on site. An update with a site visit checks quantities against what is seen, and an update without a site visit refreshes only the life and cost estimates, fund status and funding plan.